Installation of a raised deck terrace - step-by-step instructions

Clear installation instructions for a raised deck terrace on pedestals that will help carry out the work in a quick and trouble-free manner.

What does the installation of a raised deck terrace involve?

The installation of a raised deck terrace is a fast, precise process, and significantly simpler than in traditional adhesive systems. However, it is crucial to follow the technical principles that determine the durability of the entire structure.

The system involves:

  • point support of the surface (paver or joist)
  • the use of adjustable pedestals or support pads of fixed height
  • leaving expansion gaps to drain water
  • no bonding to the substrate

Thanks to this, installation is carried out "dry" and does not require mortars or grout.

If you are starting from the basics:

See also: What is a raised deck terrace

Step 1. Preparing the substrate

The first and most important stage for the safety and stability of the entire raised deck terrace.

Laying a wooden terrace on joists and adjustable support pads. Installation of the wooden terrace substructure on adjustable pedestals. The space under terrace pavers laid on adjustable pedestals. Technical drawing of installation of terrace pavers on adjustable pedestals.

The substrate must be:

  • stable
  • sufficiently hard (must not flex or sink)
  • constructed with a slope of 1.5–2% (except for terraces directly on the ground)

Depending on the substrate, it should be prepared as follows:

Ground:

  • removal of topsoil (20–30 cm)
  • compaction
  • stabilization (concrete slabs / blocks / gravel)

A detailed step-by-step description of installing raised deck terraces with various surfaces on the ground:

-> See also: How to build a raised deck terrace on the ground? A complete step-by-step guide

Concrete screed:

  • cleaning the surface
  • leveling (if necessary)
  • waterproofing protection

How to build a terrace yourself on concrete, gravel, or ground:

->See also: How to build a raised deck terrace on gravel, grass, or concrete yourself?

2. Placement of pedestals

Pedestals are arranged according to the paver format or the spacing of the joists.

Terrace pedestals adjustable for porcelain tiles. Stone aggregate base for a home terrace. Adjustable pedestals for heavy terrace pavers on a flat roof

Typical spacings:

  • 60×60 cm - every 60 cm
  • 120×60 cm - every 60 cm
  • 90×90 cm - every 45 cm (also in the center of the paver)

The following must be taken into account:

  • loads (e.g., planters, jacuzzi)
  • paver manufacturer recommendations
  • critical zones (they are described in detail in the pedestal instructions)

See also: Adjustable terrace pedestals - application, construction and selection rules

3. Leveling the structure

Each pedestal must be adjusted to the appropriate height so that the head fully adheres to the paver/joist.

A spirit level or laser level is used for control.

In more advanced systems, the following are used:

  • self-leveling heads

Thanks to this:

  • the terrace surface is perfectly even
  • the slope remains in the sub-base layer
Construction of a composite deck terrace on adjustable support pads. Porcelain tiles laid on adjustable pedestals and acoustic mats

4. Laying the surface

Measuring the height of the door threshold with a measuring tape. Plastic adjustable terrace pedestal for pavers and joists. Wooden joist grid for building a terrace on pedestals.

Option 1: terrace pavers

  1. We lay the terrace pavers directly on the pedestals, usually starting with a full paver, according to the design.
  2. If the pedestal height is insufficient, we adjust its height so that the entire head fits flush against the paver.
  3. We lay the next pavers on the pedestals and slide them up to the first paver, maintaining an expansion joint gap.

Video of laying pavers on a raised deck terrace

We lay the pavers with the appropriate joint width between them; we described how to choose it in detail here:

Gap or joint on an external terrace - how to choose the right width?

Option 2: decking boards (WPC / wood)

  1. We lay the joists on the installed pedestals, and after laying them, we still adjust the height of the pedestal to achieve the required height.
  2. Then we screw the joist through the adapter for joists located on the pedestal.
  3. Finally, we lay the boards, which are screwed or mounted with clips.

Video of laying joists on terrace pedestals

See also: Substructure of a raised deck terrace - what does it consist of and how to design it?

See also: Elevated terrace made of natural wood planks - the elegance of wood in a modern system

See also: Elevated terrace made of composite decking (WPC)

5. Finishing details

After laying the surface in the most standard areas, we move on to the more demanding ones, which require cutting pavers, adding an extra joist, increasing the number of pedestals, or using special accessories.

These include areas such as:

  • door thresholds
  • corners
  • roof drains
  • terrace edges

All information regarding the installation of pedestals in such areas can be found in the instructions.

See also: Accessories for raised deck terraces – system elements that determine durability

Construction of a large composite deck terrace on a substructure. Metal mounting clip for terrace joists.

6. Inspection and adjustment

After laying:

  • check the level of the entire surface
  • inspect the stability of the pavers/boards
  • make any necessary corrections
  • ensure the expansion joints are even

This is one of the greatest advantages of the raised deck terrace system - the ability to adjust even after installation.

Video on adjusting pedestals after paver installation

Installation of a vertical fascia board from terrace pavers using corner clips Installer leveling terrace pedestals using a spirit level. Plastic spacer cross for terrace pavers. Porcelain tiles laid on adjustable terrace pedestals

Most common mistakes

  1. Lack of a stable base
  2. Incorrect pedestal spacing
  3. Lack of slope
  4. Lack of gaps
  5. Not accounting for loads

See also: Most common mistakes during the installation of raised deck terraces

Why is the installation of a raised deck terrace faster?

Compared to glued systems, the installation time of a raised deck terrace is much faster due to:

  • no adhesives or grout
  • no drying time
  • quick error correction
  • the possibility of working in stages

This significantly speeds up the project completion time.

Summary

Installing a raised deck terrace is simple if the following principles are followed:

  • stable substrate
  • correct pedestal spacing
  • precise leveling
  • attention to details
A long balcony finished with wooden terrace boards and a modern railing. Large rooftop terrace finished with exotic wood decking boards.

FAQ

Can you build a raised deck terrace yourself?

Yes, but it requires precision and knowledge of installation principles.

Do the pavers need to be glued?

No, the system works completely without adhesive.

How long does installation take?

Usually several times shorter than in glued systems.